The daily inspection and maintenance of dry type transformer
Before the transformer is put into operation, it should be adjusted to the appropriate position according to the voltage test value of the power network, according to its nameplate and tap indicator board. If the transformer output voltage is high, in the case of ensuring that the high voltage primary side is powered off, and the connector is adjusted upward (1st gear direction); If the output voltage of the transformer is low, adjust the connector down (5th gear direction) while ensuring that the high voltage primary side is powered off. If it is a booster transformer, it is just the opposite of the above.